project PLTM Karekan

Mulai Beroperasi

05 April 2014

Lokasi

Karekan, Kec.Pagentan, Kab. Banjarnegara, Jawa Tengah

Status

Operasi

Asset 1

Kapasitas

2 x 4 = 8 MW

Asset 2

Head

89,16 Meter

Asset 3

Debit Air

12,7 m³/s

Asset 5

Penstock

1.025 meter

Asset 6

Diameter penstock

2200 mm

Scroll to Top
Scroll to Top